Yazoo River Basin Reservoirs
Last Updated -
JULY 9, 2025 @ 05:30
|
Reservoir |
Time |
Pool Elev.
|
24 Hour
change
|
Tailwater Elevaton |
Inflow
(cfs) |
Gate flow
(cfs) |
Spillway Flow (cfs) |
Total Project Flow (cfs) |
Guide Curve Elev.
|
+/- Guide Curve |
Guide Curve
Trend |
% Full
|
Inches
Runoff Avail.
|
Arkabutla |
7/9 @ 0500
| |
|
|
521 |
0 |
0 |
0 |
---- |
---- |
---- |
.1 |
9.1 |
Sardis |
7/9 @ 0500
| |
|
|
1,749 |
4,341 |
0 |
4,341 |
260.0 |
6.0 |
-.13 |
49.2 |
9.0 |
Enid |
7/9 @ 0500
| |
|
|
698 |
1,205 |
0 |
1,205 |
250.0 |
7.5 |
-.05 |
58.1 |
8.5 |
Grenada |
7/9 @ 0500
| |
|
|
-209 |
3,716 |
0 |
3,716 |
215.0 |
7.2 |
-.16 |
60.9 |
7.0 |
Ouachita River Basin
Reservoirs
Last Updated -
JULY 9, 2025 @ 05:30 |
Reservoir |
Time |
Pool Elevation |
24 Hour
change |
Power Pool
Elevation
|
Above /
Below Power Pool
|
Percent
Full |
Inches of Runoff
Available
|
Total Project
Runoff
|
Blakely |
7/9 @ 0400
|
577.83 |
-.09 |
578.1 |
-.3 |
0.0 |
10.5 |
10.5 |
DeGray |
7/9 @ 0400
|
406.67 |
-.03 |
408.0 |
-1.3 |
0.0 |
9.4 |
9.4 |
Narrows |
7/9 @ 0400
|
541.29 |
-.49 |
548.0 |
-6.7 |
0.0 |
10.1 |
10.1 |
Red River Basin
Reservoirs
Last Updated -
JULY 9, 2025 @ 05:30 |
Reservoir |
Time |
Pool Elevation
|
24 Hour change |
Tailwater |
Discharge |
Percent Full |
Inches of Runoff
Available
|
Total Project
Runoff
|
Caddo |
7/9 @ 0500
| |
-.02 |
--- |
2,470 |
---- |
---- |
---- |
Bodcau |
7/9 @ 0500
| |
-.51 |
160.29 |
658 |
1.4 |
10.0 |
10.2 |
Wallace |
7/9 @ 0500
| |
-.06 |
134.19 |
0 |
0.0 |
6.4 |
6.4 |
|