In accordance with the 21st Century Integrated Digital Experience Act (IDEA), we are undertaking a modernization initiative to improve the overall quality, accessibility, and user experience of digital services. Please visit
https://water.usace.army.mil/office/mvk/. This new platform is currently under development and will replace the Vicksburg District Water Management website in late 2025.
|
Yazoo River Basin Reservoirs
Last Updated -
NOVEMBER 11, 2025 @ 14:45
|
Reservoir |
Time |
Pool Elev.
|
24 Hour
change
|
Tailwater Elevaton |
Inflow
(cfs) |
Gate flow
(cfs) |
Spillway Flow (cfs) |
Total Project Flow (cfs) |
Guide Curve Elev.
|
+/- Guide Curve |
Guide Curve
Trend |
% Full
|
Inches
Runoff Avail.
|
|
Arkabutla |
11/11 @ 1400
| |
|
|
94 |
997 |
0 |
997 |
---- |
---- |
---- |
.2 |
9.1 |
|
Sardis |
11/11 @ 1400
| |
|
|
276 |
3,891 |
0 |
3,891 |
240.8 |
1.4 |
-.23 |
5.5 |
16.8 |
|
Enid |
11/11 @ 1400
| |
|
|
207 |
1,354 |
0 |
1,354 |
234.4 |
1.1 |
-.07 |
6.7 |
18.8 |
|
Grenada |
11/11 @ 1400
| |
|
|
51 |
1,675 |
0 |
1,675 |
198.1 |
4.9 |
.12 |
11.1 |
15.8 |
Ouachita River Basin
Reservoirs
Last Updated -
NOVEMBER 11, 2025 @ 14:45 |
Reservoir |
Time |
Pool Elevation |
24 Hour
change |
Power Pool
Elevation
|
Above /
Below Power Pool
|
Percent
Full |
Inches of Runoff
Available
|
Total Project
Runoff
|
|
Blakely |
11/11 @ 1400
|
569.59 |
-.04 |
578.1 |
-8.5 |
0.0 |
10.5 |
10.5 |
|
DeGray |
11/11 @ 1400
|
400.38 |
-.01 |
408.0 |
-7.6 |
0.0 |
9.4 |
9.4 |
|
Narrows |
11/11 @ 1400
|
536.01 |
-.07 |
548.0 |
-12.0 |
0.0 |
10.1 |
10.1 |
Red River Basin
Reservoirs
Last Updated -
NOVEMBER 11, 2025 @ 14:45 |
Reservoir |
Time |
Pool Elevation
|
24 Hour change |
Tailwater |
Discharge |
Percent Full |
Inches of Runoff
Available
|
Total Project
Runoff
|
| Caddo |
11/11 @ 1400
| |
.02 |
--- |
620 |
---- |
---- |
---- |
| Bodcau |
11/11 @ 1400
| |
0.00 |
156.27 |
65 |
0.0 |
10.2 |
10.2 |
| Wallace |
11/11 @ 1400
| |
-.02 |
134.20 |
0 |
0.0 |
6.4 |
6.4 |
|