Yazoo River Basin Reservoirs
Last Updated -
APRIL 19, 2024 @ 04:45
|
Reservoir |
Time |
Pool Elev.
|
24 Hour
change
|
Tailwater Elevaton |
Inflow
(cfs) |
Gate flow
(cfs) |
Spillway Flow (cfs) |
Total Project Flow (cfs) |
Guide Curve Elev.
|
+/- Guide Curve |
Guide Curve
Trend |
% Full
|
Inches
Runoff Avail.
|
Arkabutla |
4/19 @ 0400
| |
|
|
-574 |
2,937 |
0 |
2,937 |
210.0 |
-.9 |
-1.33 |
.2 |
9.1 |
Sardis |
4/19 @ 0400
| |
|
|
1,117 |
0 |
0 |
0 |
256.8 |
1.3 |
-.33 |
30.4 |
12.3 |
Enid |
4/19 @ 0400
| |
|
|
339 |
0 |
0 |
0 |
247.3 |
2.9 |
-.34 |
36.0 |
12.9 |
Grenada |
4/19 @ 0400
| |
|
|
1,477 |
0 |
0 |
0 |
212.1 |
6.5 |
-.25 |
48.5 |
9.2 |
Ouachita River Basin
Reservoirs
Last Updated -
APRIL 19, 2024 @ 04:45 |
Reservoir |
Time |
Pool Elevation |
24 Hour
change |
Power Pool
Elevation
|
Above /
Below Power Pool
|
Percent
Full |
Inches of Runoff
Available
|
Total Project
Runoff
|
Blakely |
4/19 @ 0300
|
576.95 |
.02 |
578.1 |
-1.1 |
0.0 |
10.5 |
10.5 |
DeGray |
4/19 @ 0400
|
406.99 |
-.11 |
408.0 |
-1.0 |
0.0 |
9.4 |
9.4 |
Narrows |
4/19 @ 0400
|
538.53 |
-.29 |
548.0 |
-9.5 |
0.0 |
10.1 |
10.1 |
Red River Basin
Reservoirs
Last Updated -
APRIL 19, 2024 @ 04:45 |
Reservoir |
Time |
Pool Elevation
|
24 Hour change |
Tailwater |
Discharge |
Percent Full |
Inches of Runoff
Available
|
Total Project
Runoff
|
Caddo |
4/19 @ 0400
| |
-.34 |
--- |
9,820 |
---- |
---- |
---- |
Bodcau |
4/19 @ 0400
| |
.15 |
165.21 |
2,315 |
29.6 |
7.2 |
10.2 |
Wallace |
4/19 @ 0400
| |
-.51 |
140.91 |
2,503 |
51.7 |
3.1 |
6.4 |
|