Yazoo River Basin Reservoirs
Last Updated -
MARCH 4, 2021 @ 16:15
|
Reservoir |
Time |
Pool Elev.
|
24 Hour
change
|
Tailwater Elevaton |
Inflow
(cfs) |
Gate flow
(cfs) |
Spillway Flow (cfs) |
Total Project Flow (cfs) |
Guide Curve Elev.
|
+/- Guide Curve |
Guide Curve
Trend |
% Full
|
Inches
Runoff Avail.
|
Arkabutla |
3/4 @ 1600
| |
|
179.84 |
3,561 |
1,837 |
0 |
1,837 |
210.0 |
15.1 |
.28 |
33.8 |
6.1 |
Sardis |
3/4 @ 1600
| |
|
201.44 |
12,833 |
1,705 |
0 |
1,705 |
241.7 |
9.3 |
.83 |
17.3 |
14.6 |
Enid |
3/4 @ 1600
| |
|
193.24 |
-620 |
1,923 |
0 |
1,923 |
235.6 |
10.3 |
-.39 |
25.2 |
15.1 |
Grenada |
3/4 @ 1600
| |
|
161.68 |
5,801 |
2,323 |
0 |
2,323 |
198.7 |
14.8 |
.10 |
32.7 |
12.0 |
Ouachita River Basin
Reservoirs
Last Updated -
MARCH 4, 2021 @ 16:15 |
Reservoir |
Time |
Pool Elevation |
24 Hour
change |
Power Pool
Elevation
|
Above /
Below Power Pool
|
Percent
Full |
Inches of Runoff
Available
|
Total Project
Runoff
|
Blakely |
3/4 @ 1600
|
577.25 |
.13 |
578.1 |
-.8 |
0.0 |
10.5 |
10.5 |
DeGray |
3/4 @ 1600
|
408.93 |
.23 |
408.0 |
.9 |
5.5 |
8.8 |
9.4 |
Narrows |
3/4 @ 1600
|
542.47 |
.13 |
548.0 |
-5.5 |
0.0 |
10.1 |
10.1 |
Red River Basin
Reservoirs
Last Updated -
MARCH 4, 2021 @ 16:15 |
Reservoir |
Time |
Pool Elevation
|
24 Hour change |
Tailwater |
Discharge |
Percent Full |
Inches of Runoff
Available
|
Total Project
Runoff
|
Caddo |
3/4 @ 1600
| |
.13 |
--- |
10,420 |
---- |
---- |
---- |
Bodcau |
3/4 @ 1600
| |
1.93 |
165.46 |
2,232 |
26.2 |
7.5 |
10.2 |
Wallace |
3/4 @ 1600
| |
.04 |
136.19 |
1,933 |
28.3 |
4.6 |
6.4 |
|